What Your Facility Needs in Place To Comply With NFPA 70B

Blue Runner Switchgear • September 21, 2026

The NFPA 70B is the Standard for Electrical Equipment Maintenance, published by the National Fire Protection Association (NFPA). And in 2023, they changed one element that matters more than any of the technical updates: it made electrical equipment maintenance enforceable.

Professional holding a pencil and reviewing their checklist on a clipboard for their NFPA 70B plan

If your building relies on gear like transformers or switchgear, but you aren't keeping a paper trail of your maintenance, it can put you in a tough spot with regulators and insurance companies.

Beyond the legal headache, you're also much more likely to experience a sudden breakdown because nobody was monitoring the hardware's condition.

With that in mind, our team at Blue Runner Switchgear put together this guide on what compliance looks like in practice for a facility.

What Changed in 2023 With the NFPA 70B Plan

For about four decades, NFPA 70B was a suggestion. A good one that well-run facilities follow, but it’s still optional. The 2023 update ended that. Now, insurers and regulators can hold you to it as an enforceable standard.

The facilities facing the highest risk aren't necessarily those skipping maintenance entirely. Instead, the danger lies in locations where work is being done but never recorded.

If maintenance isn't documented, it’s effectively invisible, and invisible efforts won’t protect a company when regulators or inspectors begin an investigation.

Your NFPA 70B Plan Checklist

Here’s a checklist you can use as a starting point to assess where your facility’s program stands:

Written Documentation Strategy

Ensure your facility has a living document that defines scope, responsibilities, intervals, and procedures. It should cover what’s maintained, who maintains it, how often, and what constitutes a pass or a flag.

Risk-Based Maintenance Intervals

One schedule doesn't fit every piece of equipment. The standard uses a criticality-based model—your main switchgear lineup, which takes the whole facility offline when it faults, needs tighter inspection cycles than a secondary panel serving non-critical loads.

Document the assets that fall into their respective category and why. That reasoning is part of what auditors look for.

Qualified Personnel and Third-Party Testing

Some tasks require outside expertise, including:

  • Commissioning after new installations.
  • Conducting post-fault verification after a breaker operation or a protective relay trip.
  • Testing aging gear that hasn't had documented work in years.

These are all tasks where NETA-certified acceptance and maintenance testing fit in.

Thermal Imaging on a Defined Schedule

A thermal scan catches developing hot spots, such as loose connections, overloaded circuits, and failing components, before they cause an unplanned outage or worse.

Thermal imaging should be part of any NFPA 70B-compliant program, not a one-time event.

Trending Data Across Inspection Cycles

A single test result tells you the condition of equipment at a moment in time. Trending data tells you whether it's getting better or worse. Contact resistance that's slowly climbing over three inspection cycles is a warning sign.

Without records, you'll never see it coming.

Complete, Retrievable Maintenance Records

Have all your paperwork ready to go, from test reports and infrared scans to general equipment history and any fixes you've made. If an inspector or your insurance company comes knocking and asks for proof, you need records that can withstand their scrutiny.

Clean Up Your Business's NFPA 70B Plan With Electrical Maintenance Services

If you're unsure where your facility’s current program stands, a maintenance audit is the practical first step. At Blue Runner Switchgear, we’ve been providing electrical maintenance services for more than 25 years, serving facilities across the United States of America, with our headquarters in Cave City, KY. We provide written reports with every service, so your program is always audit-ready.

Start with low- and medium-voltage switchgear testing if you haven't had documented work done recently, and build from there. Most facilities find gaps when they look closely. Close those gaps on your schedule, not after something goes wrong.

Ready to get started? Request a consultation today to chat with a member of our team.

Two people wearing white safety hats during a consultation about electrical maintenance needs at a f
By Blue Runner Switchgear August 26, 2026
Learn about the importance of an arc flash analysis from our expert technicians at Blue Runner Switchgear. Contact us to schedule your free consultation!
An expert technician in blue clothing, performing thermal imaging inspection on electrical equipment
By Blue Runner Switchgear July 24, 2026
Learn when to schedule thermal imaging for your facility from our experts at Blue Runner Switchgear. Contact us to reserve your free consultation!
A certified professional wearing a yellow hard hat and safety vest, inspecting a transformer
By Blue Runner Switchgear June 30, 2026
Explore the different implementation strategies of neutral grounding and learn which one is appropriate for your facility. Contact Blue Runner Switchgear!
A professional who is inspecting a temperature indicator during a transformer oil testing review
By Blue Runner Switchgear June 1, 2026
Learn what the results of transformer oil testing actually mean and how they relate to the potential risks your equipment faces. Contact Blue Runner Switchgear!
A close-up image of an industrial transformer near Cave City, KY
By Blue Runner Switchgear April 29, 2026
Transformers step up and down voltage to keep your facility powered—and testing keeps them running. Contact Blue Runner Switchgear to schedule a service.
A cartoon image of electricians performing NETA-certified electrical system testing
By Blue Runner Switchgear April 17, 2026
Learn about NETA and discover when your facility needs NETA testing from expert technicians at Blue Runner Switchgear. Contact us to schedule NETA testing.
A blueprint of an industrial transformer at Blue Runner Switchgear near Cave City KY
By Blue Runner Switchgear March 16, 2026
Blue Runner Switchgear explains how often your industrial transformers should be tested, along with other tests used to detect issues in industrial power systems.
Professional performing NETA certified electric maintenance at circuit breaker terminal.
By Blue Runner Switch Gear January 20, 2026
Learn from our experts about how to properly maintain your industrial power system. Contact us today to schedule NETA certified electrical maintenance.
A NETA certified logo next to the Blue Runner Switchgear logo.